Program Executive Office Soldier Office building Addition.
This project was a single story office building addition to the Program Executive Office Soldier Building in the Night Vision (NVESD) Campus at Fort Belvoir, VA. The building addition is an interim building that includes a new lobby, which is shared by both buildings, open office (work area) a conference room, restrooms, private offices and a kitchen area.

DGA provided Construction Administration services.  These services included shop drawing review, construction meetings, answering requests for information and project close-out services.

The building addition consists of about 7,500 square feet of modular building components that were designed with a new facade that incorporates the architectural style of the existing adjacent building.

The building addition was designed with its own, independent electrical service and heating, ventilation and air-conditioning system as the analysis of the existing building indicated that it could not support the new building addition.The construction cost for the first phase was $745,000.  The second phase is anticipated to be $2,300,000.